Martin Civil Construction were engaged through GSL to undertake the installation of a stormwater box culvert in a high-water table area of Quaifes Road Halswell.
Martin Civil Construction undertook
Service location and survey of buried services prior to excavation
Diversion of a stream/fish bypass across Quaifes road
Excavation of trench to 3.5 m deep and 5m wide
Installation of 4m, 8m and 9m sheet piles across Quaifes road and in the live stream
De-watering
Installation of Box Culvert units across Quaifes road, total of 22m in length
Installation of 4 wingwall and 2 headwalls
Backfilling
Key challenges
Overhead lines and services – minimum approach distances required request for a permit
Installation of sheet piles in a live stream requiring high level of environmental awareness
Installation of sheet piles into and through underground tree stumps
Keeping water out of site – Martin Civil put together a methodology for maintaining existing flows, storm water flows and fish passage accepted by the Client and CCC
Silt and sediment control
Pedestrians going through site – driving through site – requiring a close working relationship with GSL to work together to flag pedestrians early and warn them of site activity
We use cookies to enhance your experience while using our website. If you are using our Services via a browser you can restrict, block or remove cookies through your web browser settings. We also use content and scripts from third parties that may use tracking technologies. You can selectively provide your consent below to allow such third party embeds. For complete information about the cookies we use, data we collect and how we process them, please check our Privacy Policy